24 HOUR Contact
Mega CamHLiquid Waste Removal 24/7

combination unit

London 2013

It’s estimated that London’s complex sewage network could easily stretch the length of the Earth, collecting and feeding waste through our intricate system of drains, pipes and treatment plants. Impressive as this may be, combine it with the 8 million people living in the capital, and it perhaps takes a different stance, giving an insight into the current strain our drainage infrastructure is under.

As Europe’s most densely populated metropolis, London is experiencing the greatest levels of growth, yet it possesses some of the oldest infrastructure. Fortunately we offer clients a comprehensive service, ensuring that our sewer network is more than capable of handling everything that is thrown at it.

Combination Units

Hydro Cleansing’s combination units are capable of performing a wide range of specialised services, including but not limited to the following:

  • Desilting / Silt Removal
  • Liquid waste removal
  • Culverts cleaning
  • Gully emptying & cleaning
  • Pump station servicing
  • Interceptor cleaning
  • Drilling waste removal.

In addition to their powerful jetting units, vacuums and use of a reverse cycle facility, they are able to hold up to 13,000 litres of waste which can be used for collecting, transporting and disposing of waste, from sites.

Our unrivalled fleet enable us to treat each project individually, according to our client’s needs and requirements.

Specifications

Combination Units

  • High pressure jetting 3500psi @ 386 LPM
  • Vacuum power 1400 CFM
  • Vertical recovery to 40m + horizontal to 200m
  • Hydraulic Boom 225mm diameter + 6m reach
  • 13,500 litre waste capacity

Super Combination Units

  • High pressure jetting 4000psi @ 545 LPM
  • Vacuum power 3500 CFM
  • Vertical recovery to 70m + horizontal to 600m
  • Hydraulic Boom 225mm diameter + 6m reach
  • 18,000 litre waste capacity / 18 tonnes

Combination Units

Mega-Strong Megatron

The description of the job was pretty mundane. Can you send along a combination unit to empty out some drains which would in turn allow the contractor to handover their works to their client, a local hospital. Straight forward enough you would say. Anyway, circumstances conspired to result in Megatron attending the job, and as it turned out, that was definitely a good thing…

Megatron instantly began to recover vast amounts of rubble and other unknown tenacious items from depths of over 50m’s. The rattle of debris shooting up the suction boom and into the main hold continued, with Megatron pumping back/recycling waste water.

Stopping temporarily we identified what was still lying in the sewer, examined the filters in Megatron and carried out an inspection to make sure the sheer volume of coarse material hadn’t taken a toll on Megatron.

Megatron continued to show its capabilities and finished the job with no issues or problems whatsoever. Site management were horrified identifying the extent of the material found, which was there before they had started work.

Categories
Archives