The Twelve Days of Christmas With Hydro Cleansing | 5-8. Case Study

“On the fifth day of Christmas,
my true love sent to me,
five blogs in one,
four broken pipes,
three Septic Tanks,
two feet of tree roots,
and Hydro Cleansing’s Mega-Heat…”

Seeing as we didn’t post any blogs for you on the weekend, we are delivering a crate load of case studies to catch up! Not one case study, not two case studies, but FOUR CASE STUDIES! So sit back, relax, and read on!

megatron vacuum tanker

Megatron

The Challenge

The description of the job was pretty mundane. Can you send along a combination unit to empty out some drains which would in turn allow the contractor to handover their works to their client; a local hospital. Straight forward enough you would say. Anyway, circumstances conspired to result in Megatron attending the job, and as it turned out, that was definitely a good thing…

The Solution

Megatron instantly began to recover vast amounts of rubble and other unknown items from depths of over 50m. The rattle of debris shooting up the suction boom and into the main hold continued, with Megatron pumping back/recycling waste water.

Stopping temporarily we identified what was still lying in the sewer, examined the filters in Megatron and carried out an inspection to make sure the sheer volume of coarse material hadn’t taken a toll on Megatron.

Megatron continued to show its capabilities and finished the job with no issues or problems whatsoever. Site management were horrified identifying the extent of the material found, which was there before they had started work.


case study blocked drain

Digging Holes

The Challenge

Our client had to carry out some repairs to a waste pipe which was serving a local school. The client knew where the repair had to be completed and was also aware that there were a number of other services running within the immediate area but had no specific plans or guidance on location. Using traditional technology would have meant that the work could not be undertaken until the school was closed for at least two weeks, as the services feeding the school would have been destroyed doing the excavation.

The Solution

Megatron was deployed. Using our on board ultra-high pressure water jetting, combined with Megatron’s powerful vacuum system, a trench measuring 80 metres in length, by two metres in width and two metres in depth was cut and vacuum excavated from site. The job took a total of three working days and the services remained intact leaving the school operational throughout.


case study blocked culvert

Quick & Dirty

The Challenge

Our client has a large culvert within their manufacturing site fed by a series of drains spanning the entire thirty acre estate. The culvert had become heavily silted up with an environment agency requirement for a complete empty and clean due to the potential presence of hydro-carbons in the system. The previous contractor had used a system of excavators, scaffolding and bulk carriers completing the work in around five weeks.

The Solution

Megatron attended site with two supporting bulk tankers and a range of peripheral equipment to support the various stages of remediation. Using the vacuum pump on Megatron, we extracted the contents of the culvert and directly transferred them from Megatron into supporting bulk tankers which then took the waste off site for treatment and disposal. Having exposed the layer of silt which extended to a depth of over a metre, We then used the waste water recovered from the culvert to power Megatron’s bulk jetting system which both broke down the silt and converted it into a slurry for extraction and disposal. These operations were performed simultaneously. This process was completed, the feeding drains jetted and cleaned (including the removal of concrete waste) and the site returned to our client within seven working days.


case study canary wharf

Business Continuity @ Canary Wharf

The Challenge

The call came at lunchtime one Friday. Our client had a blockage in their drainage system which could not be specifically traced but was creating a need for toilet blocks to be closed within their twelve storey building and people to be redeployed to other adjacent locations. Their system was perceived to be generating a build up in pressure, and as it was routed via various critical facilities including the plant room housing the uninterrupted power supply, a solution was sought urgently to prevent closure of the building a series of consequential financial impacts to the business.

The Solution

By 19.00 hrs that evening a team was deployed with a range of equipment including Megatron as the centre piece. The team worked their way through the network of drains including the vast stack pipe supporting the whole side of this building which had a history of these issues dating back several years. Accessing the network at various points and applying a combination of Megatron’s vacuum pump and high pressure jetting operating at distances of over 300 metres, the building was eventually cleared by 02.00 hrs in the morning. We were able to demonstrate this by applying Megatron’s vacuum pump to the base of the stack pipe and systematically emptying toilets via suction from ten floors above. The building has had no further problems.

Clearly Megatron is a step outside the normal expectations of the market, but so are the results of the work undertaken. We certainly recognise that Megatron is not designed to compete financially with companies focused upon the rate per day as obviously the cheaper and less specified vehicle will always win. But for those clients out there, that recognise the full financial consequence of lost productivity, and the opportunity to reduce maintenance spend by achieving new levels of cleanliness, there is no match to Megatron.

Job(s) done!

The Twelve Days of Christmas With Hydro Cleansing | 2. Case Study NPL

“On the second day of Christmas,
my true love sent to me,
two feet of tree roots,
and Hydro Cleansing’s Mega-Heat…”

Continuing our twelve day countdown to Christmas, today’s blog is a nice juicy case study! However, this isn’t just any case study, this case study features blocked culverts, four foot long tree roots, over 50 TONNES of silt, and of course, an expert team of Hydro Cleansing engineers getting the job done. 

Back in the Summer we were called out to deal with some blocked culverts, syphons and silt traps by the NPL. On our arrival it was clear that there was something seriously big blocking the syphon under the railway, even our camera couldn’t travel underneath to get a clear picture. Upon further investigation the engineers discovered that the blockage was clusters of tree roots growing through the tunnels. Check out the full scope of works below!

blocked culvert case study christmas

Client – National Physical Laboratories | Kings River Outfall Desilting

Scope of Works – Desilting of culvert | Root cutting in syphon under railway | Desilting of silt traps

  1. The culvert in Normansfield Road had a high level of silt and elevated water level, the camera was then unable to return a picture of the internal condition of the pipe. We needed to remove this silt and reduce the flow during the survey, we then proposed to undertake this with a super combination unit taking one day to complete and resurvey.
  1. The syphon under the rail way had root ingress which prevented the passage of the camera, to remove this we needed to reduce the flow through the culvert and use high pressure root cutting with specialist root cutting nozzles suitable for large bore pipes. We took one day to complete and resurvey.
  1. The silt traps in five manholes needed de-silting, they contained an average of 1m of silt each. The silt traps are 2.5m in diameter which will yield approximately nine tonnes each. We took two days to complete.

case study blocked culvert and camera christmas

case study blocked culvert and roots christmas

Check out those roots! Job done!

Don’t Let A Flood Ruin Your Festive Cheer!

Hydro Cleansing Will Support You Through the Flooding Season.

Following Storm Angus, Wales and the South of England are currently being battered by high winds and even higher levels of rain fall, and as your Mother would say; prevention is better than cure! If that doesn’t inspire you to get outside and start checking your culverts and clearing your drains, then take a look at some of our flood work from previous years.

Clearing a Culvert Under the A3 Highway:

Here are some of our engineers clearing a culvert beneath the A3 on behalf of a local council. Our expert engineers were down there, in full confined space PPE to cut through the build up of silt with high pressure jets, and of course Megatron, which was on site to suck the waste away for disposal at an impressive 6000 cubic feet per minute. Megatron’s state of the art liquid ring pump creates a vacuum within the bulk tanker in order to efficiently fill it with waste, and also allows a second bulk to replace it while it disposing of the waste. This meant that the work could be continuous and we didn’t have to deploy extra vehicles which allowed us to get the job done quickly.

Culvert clean Culvert cleaning

Flood Response at a Nursing Home in Bristol:

Saving your granny is all in a days work for our teams, or at least back in June it was. We sent out our specialist engineers in a combination vacuum tanker unit to help out a nursing home near Bristol, where the flood waters were about to reach the property. The power of our tanker meant our team could remove the water from the flooded garden area and front of the property where the flood was disrupting traffic and scaring pensioners. Job done!

Flood at nursing homeNursing Home flood

So if you’re worried about flooding in your area, give us a call! Let us know where the potential flood risk is and we will call the associated council for you and arrange any necessary works. Contact us here 24/7!